MEDIA

LS NEWS

LS Cable & System develops movable trolly wire system

LS Cable&System2017-05-11


■ First movable trolly wire system for freight trains in the world
■ Expected to enhance competitiveness of logistics as the quantity of goods transported by rail is increasing
 
Anyang, May. 11, 2017 - LS Cable & System announced that it has developed ‘the movable trolly wire system for electric 
freight trains’ for the first time in the world. This could radically improve the efficiency of railroad logistics.
 
The trolly wire system is routinely applied to railroad depots, but they are now being applied to freight trains for the first
time. Recently LS Cable & System successfully completed pilot operations at Okcheon Station in Chungcheongbuk-do 
together with KORAIL.
 
The trolly wire is usually installed over the railway and supplies electricity to electric trains, thus the conventional fixed
 the trolly wire interferes with the unloading of freight containers. LS Cable & System improved on them, and moved the 
trolly wire outside of the railway so that railroad cars can be more freely loaded and unloaded.  
 
The movable trolly wire system is expected to drastically improve the freight transportation system, and enhance the 
competitiveness of railroad logistics. As electric trains cost less to maintain and have 3 times more traction than 
diesel trains, the quantity of goods transported can be greatly increased. Until now electric trains have not been
 used often for transportation of freight because of the electric car lines.  
 
“We made sure that the aluminum alloy material of the electric car lines can operate stably outdoors in spite of 
temperature changes, rain and wind,” said Dong-Wook Kim, CTO (Chief Technology Officer) of LS Cable & System. 
“We will work hard to penetrate overseas markets, mainly in Europe and Asia, where electric trains are 
widely used.”
 
LS Cable & System developed the movable trolly wire system over a two-year period from April 2015 as part of a subject 
of national policy for the Ministry of Land, Infrastructure and Transport, ‘Development of Movable Overhead
Rigid Conductor System for Container Yard’. LS Cable & System transferred the technology to its vendor, 
Jaeyeong Tech, and developed them jointly with them for the sake of shared growth with SMEs.    
 
 
[Unloading containers from trains when the movable trolly wire system is used]
Before movable trolly wire is separated
The movable trolly wire is being separated.
After the movable trolly wire system is separated
Freight is unloaded.